210 Central Park South
Chiller Installation
Despite a tight installation schedule, the new single-stage steam absorption chiller was up and running in three months, just in time to provide air conditioning for the summer cooling season.
Property:
24-story, 88-apartment cooperative with two professional offices in Midtown Manhattan.
Project Overview:
Mechanical system survey and the design and installation of a single-stage 250-ton-cooling-capacity steam absorption chiller.
Engineer:
RAND Engineering & Architecture, PC
New York, NY
Contractor:
Crystal Comfort, Inc.
$316,000 construction cost
Property Manager:
Mitchell Barry
Century Management Services
New York, NY
Scope of Work:
- Mechanical systems survey found various chiller system deficiencies, including failing temperature control valve, inoperable water-purge system, crystallization build-up, and resulting loss of cooling capacity.
- Installation of new single-stage 250-ton-cooling-capacity Trane steam absorption chiller, including associated valves, pumps, electrical controls, piping, and insulation.
- Wall sections between underground parking garage, cellar, and mechanical room were removed to transport new chiller into place.
- Installation plan avoided major inconvenience that would have resulted from demolishing garage ramp and closing underground parking facility for indefinite period of time.
- New chiller was up and running within three months of start of installation, just in time to provide air conditioning for summer cooling season.