The building’s domestic (potable)
hot water runs on a separate line from the water used for heating, but
it also can use the heat produced from the boiler, via an integral hot
water coil, to heat the water that supplies kitchen and bathroom faucets,
toilets, dishwashers, washing machines, hot water heaters, and the like.
Two other types of boilers, sectional cast iron and modular cast iron,
are used far less frequently as replacement boilers in older, large-sized
apartment buildings; they’re more common in new construction and
low-rise developments. Iron boilers are much heavier than steel ones (they
can weigh up to 800 pounds a section) and more difficult and expensive
to replace. In addition, iron boilers usually have a lifespan of less
than 25 years and are typically limited to smaller buildings because of
their limited power generation (175 horsepower compared to up to 700 HP
for steel Scotch-marine). On the plus side, cast iron boilers do not require
as much space as steel boilers and therefore are frequently found in buildings
with small basement areas.
While it’s less inexpensive to install one large boiler equipped
with an integral coil for domestic hot water production, this setup leaves
the building vulnerable to a complete loss of heat and hot water if the
boiler breaks down. Ideally, as a backup measure, if budget allows, building
owners would replace one large boiler (even if equipped with a separate
hot water heater for use during the warm weather months) with two slightly
smaller boilers (say, 75 percent capacity each). With this configuration,
the building can alternate between the two boilers, which improves heating
efficiency and extends the life of the boilers, in addition to providing
redundancy protection.
Fuels to Burn
The next factor to consider is which type of fuel to burn in the heating
plant. For systems burning only oil, there are three choices: #2, #4,
and #6 oil. Number 2 oil, which is essentially diesel oil with additives,
is the cleanest oil to burn, but it is also the most expensive. Number
6 oil is the least expensive to burn, but because of its thick viscosity
it has to be pre-heated before burning, and it tends to foul up systems,
leading to higher maintenance and equipment costs. Number 4 oil, produced
from mixing #2 and #6, has qualities in between the other two types.
For heating plants that burn #2 or #4 oil, additional equipment such
as a sidearm pre-heater and air compressor would have to be installed
to run #6 oil. Since the relative costs of the different fuel types may
change over time, project specifications for the burner replacement should
be written so that the units can burn any of the various oil types—or
gas.
Gas is the cleanest fuel to burn, but it also tends to be more expensive
than running solely on oil. One option for boards planning to replace
their burners, which typically last between 15 and 20 years, is to switch
to what’s called an interruptible system—one that burns both
gas and oil. In an interruptible system, a dual-fuel burner burns gas
most of the time and switches to oil only when the temperature dips below
18°F. Utility companies sometimes offer a more attractive rate for
interruptible service because it enables them to reduce their required
gas load during the cold weather. (The size of the discount varies based
on the size and anticipated usage of a particular building.)
If your board opts for an interruptible gas system, you will need to
install additional equipment. A new dual-fuel (gas-oil) burner will be
necessary, as well as a new gas train, which is a pipe that runs from
the utility’s gas main (the line coming into the building) to the
burner. If the new burner requires high-pressure gas, you may also need
to install a gas booster pump. For large buildings with heavy energy usage,
the utility may offer a rebate toward the purchase of this new equipment.
Heat Distribution
A crucial component all too often overlooked in a heating plant upgrade
is the distribution system. Replacing a boiler does not automatically
improve heat distribution to individual spaces throughout the building.
In any heating plant upgrade, the risers, branch lines, heating units
(radiators, baseboard heaters, etc.), and air-release valves should be
evaluated and replaced where necessary. Corrosion, leaks, or other defects
will affect the ability of the new boiler to send heat to individual apartments
and spaces. In addition, boiler water must be treated with anti-rust chemicals
to prevent deterioration to the boiler and distribution system.
Because today’s boilers are much more efficient than units installed
20 or 30 years ago, a new unit may produce more steam and hot water than
the existing heating system is able to effectively handle. A new boiler,
therefore, may also require the installation of a boiler feed-water tank
to handle the excess condensate that results from using a better-operating
unit. The feed-water tank regulates the return condensate back to the
boiler to prevent system surges and overflows.
Finally, two other important factors should not be overlooked when planning
a heating plant upgrade. First, oil tanks typically last 35 to 40 years,
but problems such as leaks caused by corrosion can develop over time and
need to be looked at as part of the overall upgrade project. Second, asbestos-containing
materials are often found in insulation around water pipes and other heating
components, so their removal will entail an asbestos abatement as part
of the heating plant upgrade, which can significantly increase the cost
and time spent on a heating plant upgrade. Failing to consider such “incidental”
items can lead to budget “surprises.”
The best time for replacing a boiler is during the warm weather months,
when the building’s heating needs will not be as pressing as during
the winter. During the eight to 10 weeks on average that it takes to replace
the existing unit, the building will need a temporary boiler. (Even during
the summer, a temporary boiler will be needed for hot water.) Temporary
boilers usually are placed in a trailer close to the building, and the
steam or hot water is piped in through a hose connection. Permits from
the New York City Department of Transportation and the Department of Buildings
will be needed if the trailer is parked on the street. (This is separate
from the Buildings Department permit needed to ultimately replace the
boiler.)
Given the considerable costs involved in a heating plant upgrade, it’s
best to start with a detailed feasibility study that addresses all relevant
factors, such as boiler size, fuel type, distribution components, additional
equipment, and the like so an appropriate and cost-effective plan of action
can be taken. With proper planning and consideration of the various upgrade
options, boards can save a great deal of money and grief over the long
haul and never be left in the cold.
More Ask the Engineer